Refine your search:     
Report No.
 - 
Search Results: Records 1-4 displayed on this page of 4
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Operation and maintenance experience on the fuel handling systems and storage facilities of "MONJU", 1

; ; Yamada, Takeshi; ; ; ; Kaito, Yasuaki; ; Kotaka, Yoshinori; ; et al.

PNC TN2410 96-005, 339 Pages, 1996/03

PNC-TN2410-96-005.pdf:14.53MB

Construction of the 'Monju' fuel handling systems was completed in April, 1992. From March 1991 to August 1992, pre-commissioning tests were carried out. In December 1992, all the systems of Monju were transfered to PNC, and commissioning tests and reactor physics tests, were started. For the first time, during these physics tests, the fuel handling systems were operated for one of the commissioning tests 'Loading to Criticality', without significant problems. 168 fuel sub-assemblies were loaded into the core and the first criticality was achieved on 5th April 1994. The fuel handling systems continued in operation for the 'Loading to Full Size of the Core', power distribution test and for cleaning discharged dummy sub-assemblies. To keep these fuel handling systems working somothly and satisfactorily annual maintenance has been carried out since 1992. This paper describes the operation and maintenance experience of fuel handling systems after the pre-commissioning tests and future study items for system reliability improvement.

JAEA Reports

None

; ;

PNC TN2410 93-017, 107 Pages, 1993/05

PNC-TN2410-93-017.pdf:12.88MB

None

JAEA Reports

Mockup test apparatus for the inspection system of steam generator tubes; Design and Manufacturing

; ; ; ;

PNC TN9410 92-254, 76 Pages, 1992/07

PNC-TN9410-92-254.pdf:2.02MB

A verification test of the inspection system of Monju steam generator(SG) tubes will be performed in near future. Mockup Test Apparatus for the inspection system of SG tubes was manufactured and installed at Mechatronics Application Reserch Facility (MARF) in OEC. The test apparatus has the same specification, which is prepared for verification test, as Monju plant; for instance, which are dimension and material of tubes, and workability for the inspection equipment. About one hundred and forty SG tubes are radially arranged in tube sheets in Monju SG, however, three tubes, inner, center and outer one, are sellected in this test apparatus for testing of inspection system, It was verified that the test apparatus was manufactured with the same accuracy and dimension as Monju. System verification test is planned using this test apparatus.

JAEA Reports

None

; ; ; ; ; ; Otaka, Masahiko

PNC TN9410 92-218, 103 Pages, 1992/04

PNC-TN9410-92-218.pdf:3.49MB

None

4 (Records 1-4 displayed on this page)
  • 1